geo

EP Group Companies

Atsi HPP


The reconstruction of N1 unit was carried out on Atsi HPP for increasing capacity, in result, installed capacity consists 18.4 MW, instead of design installed capacity 16.0 MW.
Go Back
JSC ENERGO-PRO Georgia Generation LLC gPower EPG Branches