Person who wants to receive and consume the power with the purpose of registration as customer should address to the corresponding service center of the company with the application. Person who wants to the connected (applicant) is obliged to pay 50% of the fee indicated in the application for the new consumer’s connection to the distribution network prior to submission of application and attach to application the document confirming the payment.

Fee of 0,220 kv, 0,380 kv and 6/10 kv voltage

new consumer’s connection to the distribution network

(From January 1, 2011)

1. Fee of 0,220 kv, 0,380 kv and 6/10 kv voltage new consumer’s connection to the distribution network according to the proposed package:

a) In case of provision the new consumer’s connection to the distribution network within the defined term (period)(starting provision with the power within the defined terms):

Voltage stage, kV

Capacity, kW

Period- term for provision of the new consumer’s connection to the distribution network 
(working day)

The new consumer’s connection fee including VAT

0.220

1-10

40

400

0.380

1-10

40

1200

10 to 30

40

4700

30 to 50

40

7000

50 to 80

40

10500

80 to 100

40

12000

100 to 120

40

14000

120 to 150

40

18000

150 to 200

45

23000

200 to 320

60

33000

320 to 500

60

50500

500 to 800

90

80000

800 to 1000

90

100000

6.-10

1-500

60

48500

500 to 1000

90

94000

1000 to 1500

90

137000

1500 to 2000

90

177000

2000 to 3000

90

257500

3000-5000

90

416000

b) In case of non-completion of works for the new consumer’s connection to the distribution network within the defined term (period) (nonperformance of starting provision with the power within the defined terms) the new consumer’s connection fee constitutes 50 % of connection fee given in a) sub-paragraph of this paragraph.

c) If there is an application for 0,4 kV and to provide this voltage it will be required to construct 6-10 kV network, the time frame will be doubled however will not exceed 90 working days.

Bank Requisits on which should be carried out payment of the fee for the new consumer’s connection to the network:

  • Name of recipient bank: JSC “TBC Bank”
  • Account number: GE32TB7015336030100006
  • Destination: Fee of the new customer’s connection to the network (indicate name of the applicant and actual address of the object)

In case of the connection of 3 or more customers simultaneously, multi block apartment (residential customers) simultaneous load ratio grid 

(Capacity of one customer in the residential category amounts kW 10)

Number of objects to be connected

Simultaneous load ratio

5

6

9

12

15

18

24

40

60

100

200

400

600

0,77

0,53

0,47

0,43

0,41

0,39

0,36

0,33

0,3

0,28

0,28

0,28

0,28

In case of non-residential customer:

is calculated according to the objects square area, design capacity amounts 0.140 kW per 1 m2.

Filled in application can be sent on the following e-mail address: newcustomers@energo-pro.ge

Application form for a new customer

Micro capacity application form

Application form for connecting to 6,10 breaker

Application form for connecting to 0,220 breaker