Existing Customer / Network Modification

Electricity supply of existed customer with micro capacity

Consumer has right to require connection of microcapacity power plant existing in his/her ownership to the distribution network at place for electiricty consumption by him/her. Connection of microcapacity power plant to the distribution network is carried out with payment term of “microcapacity power plant connection cost” for the distribution licencee that will be calculated in compliance with Annex №7. Installed capacity of microcapacity power plant existing in the ownership of retal consumer should not exceed the capacity to be connected to distribution network of consumer.
 
Microcapacity power plant is the renewable energy source existing under ownership of retail consumer that is connected to electricity distribution network by the retail consumer at place of electricity consumption and the installed cqapacity of which does not exceed 100 kV.

Annex № 7

Distribution network 
Connecting voltage step, kV

 

Connecting capacity to the Distribution Network in kW

 

Period-Term of connecting of a Micro capacity power station to the distribution network (working days) 

 

Fee for the connection of microcapacity power station to the distribution network including VAT in GEL

             

 

0,4

 

1-10 (220 W)

 

15

 

200

 

1-10

 

15

 

350

 

from 10 -30

 

15

 

400

 

from 30 -50

 

15

 

500

 

from 50 -80

 

15

 

600

 

from 80 - 100

 

20

 

700

 

from 100 -120

 

20

 

800

 

from 120 -200

 

20

 

900

 

from 200 -320

 

20

 

1000

 

from 320 -500

 

20

 

1100

 

from 500 -800

 

25

 

1200

 

from  800 -1000

 

25

 

1300

 

from 1000- and more kW

 

25

 

1300

           

 

 

6/10

 

from 1-500

 

20

 

1300

 

from 500 -1000

 

25

 

1300

 

from  1000- and more kW

 

25

 

2000

Bank Requisites where to pay the cost for new connection:
 
Recipient Bank: JSC TBC Bank

Account Number: GE32TB7015336030100006

Description: Connection of a micro capacity customer to the network (name of the applicant and factual address of the objects).

You may send the filled in form to the following e-mail address: newcustomers@energo-pro.ge


Annex:

Micro connection.doc


Micro group member change.doc