Power supply with micro capacity on the site in case of registration as new consumer

A micropower plant is a renewable energy source owned by a retail customer or retail customer group (including ownership, lease, leasing, or other form) that connects to an electricity distribution network, a retail customer’s internal network, or a direct distribution network. It should be noted that for the use of the status of a micro power plant, the installed capacity should not exceed 500 kilowatts. At the same time, it is not allowed for a person to use the status of a micro-power or small power plant at the same time.The retail customer or group of customers has the right to request to connect to the distribution network of the micro power plant owned by him. The connection to the distribution network of the micro-power plant is made on the condition of payment of the “micro-power connection fee” to the distribution licensee in accordance with the requirements of the “Electricity (Capacity) supply and consumption rules”. The installed capacity of a micro capacity power plant owned by a retail customer shall not exceed the capacity of the customer to connect to the distribution network, and the installed capacity of micro capacity power plant owned by a retail customer group shall not exceed the total capacity of that group of customers.

The use of a micro power plant may be requested by both the existing customer and the person wishing to connect (new customer). Accordingly, the person wishing to use the micro power plant must pay according to the request:

A) in case of connection of the existing customer to the internal network - the “Fee for connection to the micro power plant” defined in Annex №7;

B) in case of connection directly to the distribution network to the micro power plant - “0.220 kV, 0.380 kV, and 6/10 kV voltage connected to the distribution network of the new customer” provided in Annex N4 and the connection fee of “Micro Power Plant” defined in Annex 7;

C) in case of request of the user to use the micro power plant (for the arrangement of a remote metering system) - the “Fee for connection to the micro power plant” defined in Annex №7, except when the user is connected to the low voltage side of the common transformer point or has a remote metering system;

D) in case of increase in power, when there is an increase in the user's connection power, when using a micro-power plant connected to the internal network, or directly by increasing the power of a micro-power plant connected to a distribution network - Fee for the increase of capacity provided by these rules.

Annex№7

Connection to the network voltage step
kV

 

Capacity of the connection to the network kW

 

Period of new connection - time (working days)

 

(self governing city)

 

Period of new connection - time (working days)

 

(other municipality)

 

Connection of the micro-capacity power plants - period (working days)

 

New Connection fee including VAT 

                     
0,4kV  

1-10 (220V)

 

40

 

60

 

10

 

200

                   
 

1-10

 

40

 

60

 

10

 

350

                   
 

From 10 -30

 

40

 

60

 

10

 

400

                   
 

From 30 - 50

 

40

 

60

 

10

 

500

                   
 

From 50 -80

 

40

 

60

 

10

 

600

                   
 

From 80 - 100

 

40

 

60

 

15

 

700

                   
 

From 100 -120

 

40

 

60

 

15

 

800

               
 

From 120 -150

 

40

 

60

   
               
 

From 150 -200

 

45

 

60

 

15

 

900

                   
 

From 200 -320

 

60

 

90

 

15

 

1000

                   
 

From 320 -500

 

60

 

90

 

15

 

1100

                   
 

From 500 -800

 

90

 

110

 

20

 

1200

                   
 

From 800 -1000

 

90

 

110

 

20

 

1300

                   
 

From 1000 and more 

 

--

 

--

 

20

 

1300

                   

6/10 kV

 

1-500

 

60

 

90

 

15

 

1300

                   
 

From 500 -1000

 

90

 

110

 

20

 

1300

                   
 

From 1000 and more 

 

90

 

110-120 (2000 over kW)

 

20

 

2000

Bank Requisits where to pay for new connection:

Name of teh recipient bank: JSC TBC Bank

Account Number: GE32TB7015336030100006

Description: cost for micro capacity customer connection to the network (name of the applicant and factual address of the object).
You may send the filled in new connection form to an e-mail address: newcustomers@energo-pro.ge

Annex:


One-new-connection-with-micro.doc