geo

Existing Customer / Network Modification

Increase of capacity

In case of capacity increase by the existing consumer the customer is obliged to preliminary inform the Company with corresponding application that will be attached by minimum 50% tax assignment or bill of advance paid fee. If 0,4 kv (380/220V) and 6/10 kv voltage consumer increases the factual consumption capacity of electricity more with capacity to be connected foreseen by technical specification so that changing of technical specification will be necessary, in such case the Company will issue the new technical specification and arrange the power supply system of this consumer in compliance with requirements of new technical specification (will provide with full technological cycle).
Cost of capacity increase will be calculated in following way:

o If the increased (requested) capacity moves into the distribution network in other offered package of new consumers connection, herewith the consumer does not change the voltage stage – consumer should pay the fee of corresponding package for the new consumer’s connection to the distribution network from which will be deducted the fee determined by that offered package of new consumer’s connection which is in compliance with connection capacity determined by the existing technical specification of consumer’s connection (please see the calculation sample below).

o If the increased (requested) capacity moves into other offered package of new consumer’s connection and the consumer changes voltage fee – consumer should pay the fee of that offered package approved by Annex №4 which is in compliance with voltage step and capacity to be connected as requested by him/her (please see the calculation sample below).

o If the increased (requested) capacity does not exceed the scope of that offered package of new consumers connection to the distribution network which is in compliance with capacity to be connected as determined by technical specification of consumer’s existing connection:

      • For supply of the requested capacity is needed reconstruction of power network and metering knot connecting with this consumer by the distribution licensee or/and purchase, construction and installation of other appliances,    consumer should pay the fee for new consumer’s connection to the distribution network which will be calculated per kW, the fee of corresponding offered package to be connected divided on maximal capacity of package and        multiplied on additionally requested kWs by the consumer;

      • Supply of capacity requested by the consumer does not need reconstruction of power network and metering knot connecting with the consumer or/and purchase, construction and installation of other appliances – the fee    cannot be paid by consumer (correspondingly, new technical specification of connection will be issued without payment of fee by the distribution licensee).

35 kV and higher voltage consumer will increase the factual consumption capacity of consumed electricity more with capacity to be connected as foreseen by technical specification so that for supply of capacity increased by its requested or factual consumption is needed reconstruction of the power network and metering knot connecting with this consumer or/and purchase, construction and installation of other appliances, in such case for the power supply of this consumer is needed reissuance of technical specification for connection and meeting with the new technical specifications of connection by this consumer.
Capacity increase of power supply consumption is confirmed by usage of the same method by means of which was carried out determination of consumer’s capacity to be connected while working out of technical specification for connection to the distribution network.

Annex №4

 

 

term for new consumer’s connection to the distribution network

(working day)

fee of  new consumer’s connection
to the distribution network including VAT (GEL)

Voltage stage, kV

 Capacity, kW

In Self-Governing Citites

Other Municipalities

In Self-Governing Citites

Other Municipalities

0.4 kV

1-10 (220V.)

40

60

600

400

1-10

40

60

1800

1200

from 10 up to -30

40

60

7000

4700

from 30 up to -50

40

60

10500

7000

from 50 up to -80

40

60

13000

10500

from 80 up to - 100

40

60

14500

12000

from 100 up to -120

40

60

16500

14000

from 120 up to -150

40

60

18000

16000

from 150 up to -200

45

60

39000

23000

from 200 up to -320

60

90

56000

33000

from 320 up to -500

60

90

86000

50500

from 500 up to -800

90

110

136000

80000

from 800 up to -1000

90

110

170000

100000

6/10 kV

1-500

60

90

96000

60500

from 500 up to -1000

90

110

180000

110000

from 1000 up to -1500

90

110

247000

137000

from 1500 up to -2000

90

110

319000

177000

from 2000 up to -3000

90

120

463500

257500

from 3000 up to -5000

90

120

749000

416000



Sample:

a) If you are 5 kW capacity consumer of 0,4 (220 V) kv voltage stage in other Municipality besides Self-Governing City (400 GEL package) and wish to increase capacity on 0.380kV voltage stage up to 10 kW (1200 GEL package), the fee of capacity increase constitutes 1200-400=800 GEL and the cost of mentioned package in Self-Governing City is determined as 1800-600=1200 GEL.

b) If you are 10 kW capacity consumer of 0,4 (220 V) kv voltage stage in other Municipality besides Self-Governing City (400 GEL package) and wish to increase capacity on 0.380 kV voltage stage up to 30 kW (4700 GEL package), the fee of capacity increase constitutes 4700-400=4300 GEL and the cost of mentioned package in Self-Governing City is determined as 7000-600=6400 GEL.

c) If you are 30 kW capacity consumer of 0,4 kV voltage stage in other Municipality besides Self-Governing City (4700 GEL package) and wish to increase capacity on 6/10 kV voltage stage up to 1000 kW (94000 GEL package), the fee of capacity increase constitutes 94000 GEL and the cost of mentioned package in Self-Governing City is determined by 170000 GEL.



 

 

Bank Requisites on which should be paid the fee of new consumer’s connection to the network:

Recipient Bank: JSC “TBC Bank”

Account Number: GE32TB7015336030100006

Description: Fee of the new consumer’s connection to the network (should be indicated the name of applicant and factual address of object). 

Filled in application form for capacity increase should be sent to the following e-mail address:newcustomers@energo-pro.ge 

Annex:
Application form_Increase of Capacity


       Capacity increase for multistored objects