Regulated New Connection

Regulated New Connection

In case of construction of the residential block, enterprise or other object, also seperation of real estate (customer), when connection of the new customer to the distribution network takes place, person (or group of persons) shall apply to the System Operator with the application “on request for connection of the new object to the distribution network” (that represents request for connection on standard terms of the contract for connection of the new object to the distribution network in written form (electronic or material form). If the requested connection is not in compliance with the definition for the connection of the new object foreseen by the rules, it is not admissible to discuss the mentioned based on the articles 17 and 18 of the rules and System Operator is obliged to return advanced paid fee for the connection to the person who made a request within 10 days period.

In the case of connecting a multi-apartment residential building to the distribution network or connecting a new facility to the 220 V voltage level, the applicant for connection is obliged to fully pay the fee for connecting the new facility to the distribution network specified in the application before submitting the application. In other cases, the applicant must pay 50% of the fee for connecting the new facility to the distribution network before submitting the application, and pay the remaining amount (unless the parties have agreed on other terms) from the date of commencement of electricity supply:

a) Residential customer – within 20 days from the date when the electricity supply was started;

b) Nonresidential customer – within 10 days from the date when the electricity supply was started.

The applicant (applicant) is obliged, before submitting the application, to fully pay the fee for the connection of the new facility to the distribution network indicated in the application, when there is: a) connection of a multi-apartment residential building to the distribution network; b) connecting a new facility to the 220 V voltage level.

System operator is obliged after payment of the connection fee for connection of the new object to the distribution network is done, works (whole technological cycle) of connection to the distribution network of new objects to the 0,220 kv, 0380 kv and 6/10 kv voltage to carry out within that territory boundaries where carries out electricity distribution.

a) In case of 0,4 kv voltage new object – in 600 m radius from existed 0,4 or 6-10 kv distribution network under system operator ownership

b) In case of 6/10 kv voltage new object – in 6 km radius from distribution network under system operator ownership

Connection of the new object shall be carried out in accordance with the terms requested by the relevant application. Person who wants to be connected has the right to choose:

a) Metering knot voltage stage where the metering knot should be organized (except the case foreseen by the article 18 and 16 of these rules)

b) Connection capacity on relevant voltage stage where metering knot in line with the offered package should be organized.

 

Annex №2

Fee for connection to the distribution network of the new object at 0,220 kV, 0,380 kV and 6-10 kV voltage

Fee for connection to the distribution network of 0.4 kV and 6/10 kV voltage new object according to the offered package:

A) in case of providing the new object with connection to the distribution network within the defined date (period):

Voltage level, kV Capacity, kW Deadline for connecting a new facility to the distribution network (working day) Connection fee for a new facility (including VAT) GEL
In a self-governing city In other municipalities
0.4 10 (1-10 kW 220 V.) 40 60 1600
10 (1-10 kW 380 V) 40 60 2500
from 10 to 30 40 60 8800
from 30 to 50 40 60 17500
from 50 to 80 40 60 28000
from 80 to 100 40 60 35000
from 100 to 120 40 60 45000
from 120 to 150 40 60 56000
from 150 to 200 45 60 100000
from 200 to 320 60 90 138000
from 320 to 500 60 90 210000
from 500 to 800 90 110 270000
from 800 to 1000 90 110 337000
from 1000 to 1300 90 110 360000
from 1300 to 1600 90 110 400000
from 1600 to 2000 90 110 500000
from 2000 to 2600 90 110 650000
from 2600 to 3200 90 110 800000
6-10 kV from 1-500 60 90 163000
from 500 to 1000 90 110 250000
from 1000 to 1500 90 110 358000
from 1500 to 2000 90 110 438000
from 2000 to 3000 90 120 580000
from 3000 to 5000 90 120 936000




Annex №4

Dates and fees for setting up a smart meter

 

Voltage level, kV Capacity, kW აDeadline for setting up the accounting system (working day) Cost of installing a multifunctional electronic accounting system, including VAT, GEL Cost of installing a smart meter, including VAT, GEL
0.4 1-10 (220 V) 15 600 450
1 to 10 15 1200 1000
10 to 30 15 1200 1000
30 to 50 15 1200 1000
50 to 80 15 1500 1200
80 to 100 20 1500 1200
100 to 120 20 1800 1200
120 to 150 20 1800 1200
150 to 200 20 2000 1200
200 to 320 20 2500 1200
320 to 500 20 3000 1200
500 to 800 25 3500 1200
800 to 1000 25 3800 1200
1000 and more kW 25 4000 1200
10 kV 1-500 25 13000 2200
500 to 1000 25 14000 2200
1000 and more kW 25 15000 2200
  

 

b) When requesting the connection of two or more new facilities together, the fee for connecting the new facility to the distribution network shall be determined by adding the fee for the package offered for the installation of a multifunctional electronic metering system specified in Appendix 4 for each new facility to the fee provided for in paragraph 1 of this Article.

c) At the same time in case of connection of 2 or more customers, table of the coefficient of simultaneous load of the block of flats (residential customer) for the  sector supplied with the gas.

Number of Customers           New Ratio          
2  0.776
3 0.662 
5 0.56 
6 0.53 
9 0.47 
12 0.43 
15 0.4 
18 0.39 
24 0.365 
40 0.33 
60 0.3 
100 0.28 
150 0.265 
200 0.257 
250 0.251 

 

Note:

  • One residential category consumer’s capacity is 10 kW.
  • In case of non-resident consumer is calculated according to the object area  and designed capacity is 0,140kW  per 1 m2.

Bank Requisites on which should be paid the fee of new consumer’s connection to the network:

 
Recipient Bank: JSC “TBC Bank”

Account Number:GE32TB7015336030100006

Recipient Bank: JSC "Bank of Georgia"

Account Number: GE04BG0000000609622943

 

Description: Fee of the new consumer’s connection to the network (should be indicated the name of applicant and factual address of object). 


Filled in application form for the new consumer’s connection to the network should be sent to the following e-mail address: newcustomers@energo-pro.ge