812 result(s) found for "r"
connection of autonomous electric vehicles to a charging point/station
the conditions for connecting the charging point/station to the distribution network apply only to the connection of charging devices to the distribution network, the use of which is not restricted to a circle of persons and is not intended for personal use only. in addition, connecting the charging station to the network does not mean supplying electricity to the facility or a defined area at the place of its placement. the connected power of the charging station does not participate in the calculation of the connected power of the object or the defined area at the place of its placement, and the use of the charging station (electricity consumption) for other purposes is not allowed. the electric charging station must be equipped with an independent power source and must have an individual smart meter.
the person wishing to be connected must apply to the relevant system operator in physical or electronic form (in written form) with the "application for connection to the distribution network of charging stations for electric autonomous vehicles" approved by the commission's decision.
the person wishing to be connected is obliged to submit the consent of the charging station (device) placement to the system operator with the application, unless the person wishing to connect (applicant) and the real estate owner are the same person.
connection fee for charging device at 0,4 kv (380/220v) and 6/10 kv to the distribution network is 50% of the new facility connection fee, according to the offered package.
the fee for increasing the capacity for connection of the charging station/plant connected based on the above mentioned paragraph is 50% of the fee of connecting capacity increase determined by the package corresponding for the standard cases of capacity increase (in accordance with the offered packages)
if the location of the charging station (facility or defined area) is not supplied from another supply point, the case where no more than 20% of the capacity for connection is used to supply electricity to this facility and/or its location (territory) shall not be considered as another purposeful use of the charging station. and/or for the generation of electricity with own means of electricity generation. in this case, the user is responsible for the protection and control of the permissible limit of use of the charging station for other purposes in his internal network. however, the burden of proving the authenticity of this information is imposed on the user.
in the case of granting the consent for the placement of a charging station for a specific period, connection must be canceled immediately after the termination or expiration of this consent, if the purpose of the station is not maintained by the owner or by the new owner. the system operator is obliged to inform the user registered at the charging station in the shortest possible time.
the connection of the charging station to the distribution network must be done separately and an individual metering system must be arranged, regardless of whether the place of connection (facility or defined area) is supplied with electricity.
if the charging station and other objects are connected to one cadastral code, the capacity of the connecting object and the charging station's connecting power must be indicated separately.
if the user intends to use the charging station connection for another purpose, he must inform the system operator in advance.
if the connection of the charging station is not carried out during one year period after completion of the connection works provided for in this article or the charging station is not used for 10 years, the system operator is entitled to cancel this connection, after notifying the user 3 months in advance. the user has the right to request the cancellation of the independent power source of the charging station, and the system operator is obliged to fulfill the request in the shortest possible time, without paying any additional fees or costs.geo application forms:
connecting the charging station
increasing the capacity of the charging station
Link to page: connection of autonomous electric vehicles to a charging point/station
private mean for electricity generation
by informing the system operator in advance, the user has the right to use his own/personal means of electricity generation, foreseeing the conditions that the produced/generated electricity will not flow into the distribution network and will be fully utilized only for the user's own consumption. flow of electricity generated by own means of electricity production/generation to the distribution network of the system operator is allowed only in the case of registration of the said means of production with the system operator as a micropower power plant or in the wholesale market of electricity as a generation licensee or a small power plant in the same part of the means of production.
the overflow in the electricity distribution network must be limited by the user in the internal network by arranging the corresponding automatics or other technical means, or/and the special scheme of user’s internal network that technically restricts overflow of the generated electricity into the distribution network.
with the purpose to control the overflow in the electricity distribution network, a two-way (reverse) meter is installed at customer who owns his personal means of electricity generation in accordance with the following procedure: upon detection of the fact of using his own means of electricity production, the system operator informs the customer in accordance with the applicable legislation of the means of generation on prohibition of electricity overflow in distribution network before the registration at electricity wholesale market or with the system operator and will give a reasonable term to the customer for registration, which should not be more than 3 months.
after the expiration of the mentioned period without results, if during this period the user has not requested installation of a two-way (reverse) meter with a relevant application, system operator will install the two-way (reverse) electricity meter itself and will charge the user with the fee for the installation of a smart meter, in accordance with the offered packages defined in appendix no. 4 of the rules.
in case of violation of restriction condition for flow in the electricity distribution network by the user, when the means of generation owned by the user is not registered in the appropriate form in the retail or wholesale electricity market in accordance with the acting legislation, and the data recorded on the two-way (reverse) meter installed with the user proves that the electricity has been generated in the distribution network illegally for (unauthorized) overflow, the system operator will take appropriate measures, including:
the customer shall not set a reasonable time limit for the arrangement of the appropriate automation or other technical means in the internal network, and after the expiration of the mentioned period without result, he shall arrange the appropriate automation in the distribution network and demand a one-time reimbursement of the expenses incurred to prevent overflow in the electricity network.geo application form:
notification of the use of own means of electricity generation or change of capacity
Link to page: private mean for electricity generation
vacancy
for detailed information regarding vacancies please press the button: vacancy
Link to page: vacancy
employment procedures
qualified candidates who will to work with us have the opportunity to participate in vacancy competitions. information about competition is being placed on the company web page and employment search web agencies. competition comprises of several stages and starts from submission and revision of applicants application form and resume. candidates selected for the second stage will undertake professional tests and in case of success will be invited for an interview. all candidates are evaluated equally by standard terms and all of the candidates have the opportunity to demonstrate knowledge and skills. candidates are invited to participate a day in advance before the testing. each stage of the competition is transparent, while results – countable. deriving from that candidates with higher scores move to the next stage and receive employment proposal. one of the major goals of our company is creation of professional cadres’ resource oriented on development and professional growth. accordingly, on the bases of practical training company is oriented to employ personnel with high qualification, develop their skills and abilities.recruitment for 7th circle positionsin frame of internship program, epg offers its potential employees practical training for 7th circle positions:1. technician 2. technician-electrician 3. duty electrician 4. driver electrician 5. duty driver electrician 6. electrician 7. duty on substation 8. billing operator
to be recruited for these positions you must undertake internship program. after the internship you will be enrolled into transparent employment process, where evaluation criteria is utterly determined and all candidates are given equal opportunity for employment.
Link to page: employment procedures
mtskheta-mtianeti branch
branch address: mtskheta, 3300, narekvavi st. #3
6 service centers
hv network length 422,5 km
branch
6-10 kv
0.4 kv
total
east
1612
2928
4540
number of customers: 105 170
1
mtskheta
narekvavi str. #3a
2
dusheti
aghmashenebeli str. #108
3
tianeti
300 aragveli str. #5
4
kazbegi
stepantsminda, al. kazbegi str. #47
5
kaspi
rustaveli str. #11
6
tbilisi
vakhtang chelidze str. 26 a
Link to page: mtskheta-mtianeti branch
south georgia branch
branch address: khashuri, imereti str. #729 service centers hv network length 899 km
branch
6-10 kv
0.4 kv
total
south
2667.703
7 915.22
10 582.923
number of customers: 217 806
1
gori
shindisi highway 4th km, village ortasheni
2
khashuri-kareli
khashuri, imereti str. #72
3
akhaltsikhe-adigeni
akhaltsikhe, abastumani highway #10
4
borjomi
rustaveli str #93a
5
aspindza
daba aspindza, king tamara str. #1
6
akhalkalaki-ninotsminda
akhalkalaki, tavisupleba str. #95a
7
sachkhere
gomarteli str. #8
8
chiatura
chavchavadze str. #32
9
kareli
kareli, muskhelishvili str. #2
Link to page: south georgia branch
west georgia central branch
branch address: kutaisi, nikea cul de suc 413 service centershv network length 908,8 km
branch
6-10 kv
0.4 kv
total
west central
2 937.382
7 213.27
10 150.652
number of customers: 263 517
1
kutaisi
nikea cul de suc 4
2
zestaphoni
king tamara str. #75
3
samtredia
gamsakhurdia str. #17
4
khoni
shamatava str. #1
5
tskaltubo
9 april 3rd turn, company yard 006
6
vani
king tamara str. # 51
7
baghdati
rustaveli str. #27
8
tkibuli
gelati str. #4
9
terjola
rustaveli str. #96
10
kharagauli
king solomon str. #107
11
ambrolauri
bratislava-racha str. #3
12
oni
mindeli str. #1
13
tsageri-lentekhi
tsageri, rustaveli str. 67
Link to page: west georgia central branch
west georgia regional branch
branch address: batumi, bagrationi str. #103 17 service centershv network length 1221.8 km
branch
6-10 kv
0.4 kv
total
west regional
4 155.133
11 536.8
15 691.933
number of customers: 369 807
1
zugdidi
qobulava str. # 6
2
senaki
st. nino str. #15
3
martvili
freedom str. #2
4
abasha
freedom str. n79
5
chkhorotsku
king tamar str. # 6 building 1
6
tsalenjikha
king tamara str. #34
7
khobi
stalin str. # 17
8
mestia
jondo khaptani str. #7
9
poti
st. george str. #20
10
batumi
bagrationi str. #103
11
kobuleti
popovi str. # 5
12
khelvachauri
batumi, tsitsishvili-panaskerteli 1st turn #5
13
chokhatauri
kostava 1st turn #1
14
ozurgeti
9 april #9
15
lanchkhuti
kostava str. #1
16
khulo
memed abashidze str. #9
17
shuakhevi-keda
shuakhevi, chavchavadze str. # 23
Link to page: west georgia regional branch